
Traffic control that turns up.Cairns to the Riverina, 24/7.
ISO-certified crews, TMR and TfNSW compliant plans, 13 regional depots, one call.
- Since 1993Three decades of regional road work
- 13 depotsQueensland and New South Wales
- ISO certifiedQuality, safety and environment
- TMR and TfNSWCompliant plans and permits
- Approved supplierLGP, LGCA and Local Buy
Trusted by principal contractors, utilities and councils
Approved supplier
Traffic control for the job you actually have
Roadworks, events, storm response, council programs, utility works, night shifts and straight crew hire. Seven services, one Area Manager, the same accredited crews and in-house planners behind all of them. Pick the one closest to your job and you will see what is included, which road authority rules apply and what we need from you.
Councils and governmentReseal programs, maintenance, streetscapes and civic events. LGP, LGCA and Local Buy approved.
Emergency and disaster responseCyclones, floods and storm damage: closures, detours and access for recovery crews, 24/7.
EventsConcerts, shows, parades and fun runs: event TMPs, closures, pedestrian crossings and crowd egress.
Night worksLighting, PTCDs, fatigue-managed crews and staging for after-dark closures and low-volume windows.
Roadworks and civilHighway upgrades, reseals, intersections, pipelines and subdivisions, with TGS and permits handled in-house.
Traffic controller hireAccredited TCs and TMIs to implement your plan, by the shift or for the project, with vehicles and gear.
Utilities and energyPowerline works, water mains, telecommunications and renewable projects, reactive and planned.How a booking works
Three steps from first call to crew on site. No portal, no waiting for a sales team.
Send us the job
Call 1300 011 203, use the quote form above, or scope the job in three steps on the traffic control page: location, works, hours, duration and layout. Tell us the start date and whether it is day or night.
Your Area Manager confirms crew and plan
The local Area Manager checks the site, confirms crew numbers and vehicles, and tells you whether the job needs a Traffic Management Plan, a Traffic Guidance Scheme or an existing scheme. Our in-house designers prepare what is needed and we lodge road authority permits where required.
Crew on site, early, with pre-start and dockets
The crew arrives ahead of your start time, walks the site against the plan, runs the pre-start, stages the setup from advance signs to the control point, and signs off a docket each shift. The TMI on site monitors and adjusts through the day.
Find your nearest depot and Area Manager
13 depots from Cairns to Young. Each one is run by a local Area Manager with a mobile you can call, crews who know the roads, and a yard of signage, VMS trailers and utes ready to go. If your site is between depots, the closest one mobilises. Tap a marker for the name, number and address.
Queensland
Why project managers book ECTC
A local Area Manager you can ring
Every depot has a named Area Manager with a mobile number on this site. You deal with the person who allocates the crew, not a call centre. They know the local TMR district, the council and the roads.
24/7, and we mean the phone is answered
Night works, weekend closures, storm response and a crew that did not show from someone else. The operations line runs around the clock and crews are mobilised from the nearest of 13 depots.
Plans and crews from the same company
Our in-house Traffic Management Designers prepare the TMP and TGS, our TMIs set it out and our controllers run it. The plan lodged with TMR, TfNSW or council is the plan the crew implements. No gap between the document and the day.
Compliant in both states
Queensland work follows TMR's MUTCD Part 3 and the Queensland Guide to Temporary Traffic Management. NSW work follows Transport for NSW requirements. Our crews hold the accreditation for the state they work in; we never send a QLD-only ticket to a NSW job.
Our own fleet and gear
Cone deployment trucks, utes with arrow boards, VMS trailers, portable traffic signals, lighting for night works and TMA-accredited drivers for high-speed corridors. Checked at the depot before it leaves the yard.
30 years, ISO certified, ASX-listed parent
Established 1993, head office on the Sunshine Coast, ISO quality, safety and environment certified, and part of TIP Group (ASX listed). Approved supplier to LGP, LGCA and Local Buy, so councils can engage us through those arrangements.
Work we have done, with the client named
A 36-hour Bruce Highway closure in Rockhampton for Queensland Rail with 22 controllers and 18 utes. The Smithfield Bypass and Cairns Western Arterial duplication for TMR contractors. Flooded roads across the South West Slopes of NSW. Real jobs, real road authorities, and the depot that ran each one.
Bruce Highway, Cooroy to Curra Section DBielby-BMD joint venture / Bruce Highway between Cooroy and Curra (Gympie Bypass), QLDRead the job
Cairns Western Arterial Road duplication, Redlynch Connector Road to Captain Cook HighwayAlbem Constructions / Cairns Western Arterial Road, Redlynch Connector Road to Captain Cook Highway, Cairns QLDRead the job
Capricorn Highway and Bruce Highway reseal programCapricorn Highway and Bruce Highway between Rockhampton and EmeraldRead the jobWhat clients say when the job is done
Councils, rail operators, pavement contractors and crane companies, named, with their role. We do not edit them.
Century Cranes have used Bruce and the team at East Coast Traffic for many years we rely on them for everything traffic control, from the Traffic Management Plan to the crew being there at all hours of the day and night. These guys have NEVER let us down.
I have engaged East Coast Traffic Control over the past 5 years with great results, their team are professional in the task performed. This can be seen by their on-time performance and zero incidents within this time. The team also complete my traffic management plans that suit the requirements by local laws.
East Coast Traffic Control have been very supportive to Durkin on this project and we appreciate your assistance on working through this and helping us deliver a project to our client outside of NSW. You have been very responsive to emails and calls. The site crews have been very active following our crew around, being flexible and ensuring the setups are done correctly as per what we have required on site. Well done.

Hold a current TC ticket? Apply in two minutes.
We hire licensed traffic controllers and TMIs at every depot from Cairns to Young. Fill in the employment form and the local Area Manager reviews it. ECTC is not a training provider; if you are not yet licensed, our course page lists RTOs in your state.
Apply nowFrom the road
Project write-ups, road authority rule changes, cyclone season planning and what our crews are doing this month across Queensland and NSW.
Questions we hear before every job
Do you cover my site?
If it is in Queensland or New South Wales, almost certainly. We run 13 depots from Cairns down the Queensland coast to the Gold Coast, then Coffs Harbour, Dubbo, Young, Wagga Wagga and Tumbarumba in NSW, and crews travel between them. Enter your site suburb in the quote form and the nearest Area Manager replies.
Are you compliant with TMR and Transport for NSW?
Yes. Queensland plans and setups follow the TMR Manual of Uniform Traffic Control Devices Part 3 and the Queensland Guide to Temporary Traffic Management. NSW work follows Transport for NSW's Traffic Control at Work Sites framework. Our controllers hold the accreditation for the state they work in, and our in-house designers prepare TMPs and TGSs for both.
How quickly can you get a crew to site?
It depends on the location, the date and whether a plan or permit is needed first. We operate 24/7 and mobilise from the nearest depot, so short notice jobs are normal for us. Call 1300 011 203 with the site and start time and the Area Manager will tell you what is possible.
Do you do the traffic management plan as well as supply the crew?
Yes. Traffic Management Designers on staff prepare the Traffic Management Plan and Traffic Guidance Schemes, and we lodge the permit with TMR, the council or the police where the job needs one. You can also book planning only, or crews to implement a plan you already hold.
What does traffic control cost?
Price depends on crew size, hours, day or night, vehicles and equipment, and whether a plan or permit is needed. We quote each job on those details rather than a rate card, which is why the quote form asks for location, works, hours and layout. Send it through and you get a priced scope back, not a sales call.
Need crews on a date? Tell us the site.
Send the location, the works and the hours. Your local Area Manager confirms crew, plan and permits. Or call 1300 011 203 any time, day or night.













